Ageing of Reinforced Concrete (RC) structures is an important problem nowadays, in particular for countries like Italy in which the main infrastructures were built 55 years ago. Carbonation and chloride penetration represent the main causes of reinforcements corrosion because they reduce the passivation of reinforcing steel in concrete. In this paper the structural assessment of an existing RC water bridge and the following retrofitting design is presented. Built in the years between 1953 and 1961 in Sardinia (Italy), it is a 180 m long bridge with 18 spans of 10 m. It is characterized by a U-shape cross section (5.7 m width, 3.8 m height). The structure was damaged by water and environmental action that produced concrete degradation and reinforcements corrosion. Existing material characterization and structures conditions assessment will be discussed along with the retrofitting project. The latter is characterized by a structural jacketing of the bridge piers with new concrete and reinforcements. The bridge cross-section will be also retrofitted with a complete external jacket casted with self-compacting concrete (SCC). Particular attention has been devoted to the new joints that connect the 40m long bridge sections. Indeed, they should guarantee water tightness even with the important longitudinal displacements due to structural load.
Structural assessment and retrofitting of damaged reinforced concrete water bridge
Flavio StochinoPrimo
;Fausto Mistretta
Secondo
;Luisa PaniUltimo
2019-01-01
Abstract
Ageing of Reinforced Concrete (RC) structures is an important problem nowadays, in particular for countries like Italy in which the main infrastructures were built 55 years ago. Carbonation and chloride penetration represent the main causes of reinforcements corrosion because they reduce the passivation of reinforcing steel in concrete. In this paper the structural assessment of an existing RC water bridge and the following retrofitting design is presented. Built in the years between 1953 and 1961 in Sardinia (Italy), it is a 180 m long bridge with 18 spans of 10 m. It is characterized by a U-shape cross section (5.7 m width, 3.8 m height). The structure was damaged by water and environmental action that produced concrete degradation and reinforcements corrosion. Existing material characterization and structures conditions assessment will be discussed along with the retrofitting project. The latter is characterized by a structural jacketing of the bridge piers with new concrete and reinforcements. The bridge cross-section will be also retrofitted with a complete external jacket casted with self-compacting concrete (SCC). Particular attention has been devoted to the new joints that connect the 40m long bridge sections. Indeed, they should guarantee water tightness even with the important longitudinal displacements due to structural load.File | Dimensione | Formato | |
---|---|---|---|
IABSE 20th Congress_The Evolving Metropolis, NYC 2019 -Stochino_Mistretta_Mancini_Pani.pdf
Solo gestori archivio
Descrizione: Articolo principale
Tipologia:
versione editoriale (VoR)
Dimensione
3.84 MB
Formato
Adobe PDF
|
3.84 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.