The studies conducted on Building Information Modeling methodology and its associated tools spotlight the related great improvement in managing the construction phase. This paper shows how BIM4D simulation can boost the accuracy of the temporal and economic forecast of the constructive intervention. This approach can reduce problems related to the incorrect interpretation of the work program because it is able to directly relate the information model with the work program in a single environment. Moreover, this contribution reports the strong improvement in the construction phase management by the integration of BIM 4D methods and tools and a geospatial 3D mapping platform.
BIM based workflow for 4D construction planning
Rubiu, Giulia
Primo
Conceptualization
;Quaquero, EmanuelaSecondo
Supervision
;Desogus, GiuseppePenultimo
Membro del Collaboration Group
;Stocchino, GiovannaUltimo
Writing – Original Draft Preparation
2022-01-01
Abstract
The studies conducted on Building Information Modeling methodology and its associated tools spotlight the related great improvement in managing the construction phase. This paper shows how BIM4D simulation can boost the accuracy of the temporal and economic forecast of the constructive intervention. This approach can reduce problems related to the incorrect interpretation of the work program because it is able to directly relate the information model with the work program in a single environment. Moreover, this contribution reports the strong improvement in the construction phase management by the integration of BIM 4D methods and tools and a geospatial 3D mapping platform.File | Dimensione | Formato | |
---|---|---|---|
2022_EC3_ID196_Camera_Ready_Paper.pdf
Solo gestori archivio
Tipologia:
versione editoriale (VoR)
Dimensione
378.37 kB
Formato
Adobe PDF
|
378.37 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.