In the current distribution system most of existing electrical infrastructure is becoming aged due to the delayed replacement of assets caused by distribution company’s budget constraints. Bearing in mind these aspects, the authors have developed a technique for the evaluation of the distribution system reliability based on a Sequential Monte Carlo (SMC) which takes into account the role of equipment ageing. Real-world examples are provided to illustrate the effect of including ageing system failures into system and individual reliability indexes.

Distribution System Reliability Assessment Considering Equipment Ageing

GHIANI, EMILIO
Primo
Conceptualization
;
MOCCI, SUSANNA
Secondo
Software
;
PILO, FABRIZIO GIULIO LUCA
Ultimo
Supervision
2007-01-01

Abstract

In the current distribution system most of existing electrical infrastructure is becoming aged due to the delayed replacement of assets caused by distribution company’s budget constraints. Bearing in mind these aspects, the authors have developed a technique for the evaluation of the distribution system reliability based on a Sequential Monte Carlo (SMC) which takes into account the role of equipment ageing. Real-world examples are provided to illustrate the effect of including ageing system failures into system and individual reliability indexes.
2007
Sequential Monte Carlo (SMC), reliability, power distribution system
File in questo prodotto:
File Dimensione Formato  
CIRED2007_0392_paper.pdf

Solo gestori archivio

Tipologia: versione editoriale
Dimensione 195.15 kB
Formato Adobe PDF
195.15 kB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11584/104547
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact