For the expansion of the existing metro in Copenhagen (Cityringen project), the construction of one station has been envisaged in front of the church of Marmorkirken (out of the 18 new stations in total). This church is the most important of the whole of Denmark, and it’s an ancient heterogeneous structure composed of granite rocks, boulders, marble columns and masonry. The process of the Building Risk Assessment had to take into account the peculiarities of the structure. A cadastral research has been done in order to collect as much of Church’s data as possible, and a campaign of structural investigations has been performed in order to assess the mechanical properties of the building materials; these data have been used as input for the numerical model. For each phase of excavation of the station a continuous comparison has been performed between the numerical forecast and the monitoring data. The comparison allowed for the fine tuning of the numerical model and make it even more adherent to the physical model. The station is actually completed and the final displacements measured on the church have been perfectly aligned with the predictions of the numerical model. The note describes the whole process of analysis.

Nell´ambito dei lavori di costruzione della nuova metropolitana di Copenhagen Cityringen, la costruzione di una delle stazioni è stata prevista dinanzi la chiesa di Marmorkirken. Questa chiesa risulta la più importante dell’intera Danimarca, ed è una struttura eterogenea composta da massi granitici, blocchi e colonne di marmo e muratura. Il processo di Building Risk Assessment ha dovuto tenere conto delle pecurialità dei caratteri strutturali della Chiesa; è quindi stato necessario impostare una campagna di rilievi e indagini strutturali per definire le caratteristiche meccaniche dei materiali per impostare un modello ad elementi finiti in grado di valutare con migliore approssimazione gli effetti dello scavo di stazione sulla struttura. Le tempistiche dello scavo della stazione hanno consentito di attuare un confronto continuo tra le previsione numeriche e i dati di monitoraggio per ogni fase di scavo, permettendo di tarare il modello numerico e renderlo ancora più aderente al fenomeno fisico. La stazione è attualmente completata e gli spostamenti finali misurati sulla chiesa sono risultati allineati alle previsioni del modello. Nella nota si descrive l’intero processo di analisi seguito.

Il processo di Building Risk Assessment condotto sulla chiesa di MarmorKirken (Cityringen Metro)

SOCCODATO, FABIO MARIA
2017-01-01

Abstract

For the expansion of the existing metro in Copenhagen (Cityringen project), the construction of one station has been envisaged in front of the church of Marmorkirken (out of the 18 new stations in total). This church is the most important of the whole of Denmark, and it’s an ancient heterogeneous structure composed of granite rocks, boulders, marble columns and masonry. The process of the Building Risk Assessment had to take into account the peculiarities of the structure. A cadastral research has been done in order to collect as much of Church’s data as possible, and a campaign of structural investigations has been performed in order to assess the mechanical properties of the building materials; these data have been used as input for the numerical model. For each phase of excavation of the station a continuous comparison has been performed between the numerical forecast and the monitoring data. The comparison allowed for the fine tuning of the numerical model and make it even more adherent to the physical model. The station is actually completed and the final displacements measured on the church have been perfectly aligned with the predictions of the numerical model. The note describes the whole process of analysis.
2017
Nell´ambito dei lavori di costruzione della nuova metropolitana di Copenhagen Cityringen, la costruzione di una delle stazioni è stata prevista dinanzi la chiesa di Marmorkirken. Questa chiesa risulta la più importante dell’intera Danimarca, ed è una struttura eterogenea composta da massi granitici, blocchi e colonne di marmo e muratura. Il processo di Building Risk Assessment ha dovuto tenere conto delle pecurialità dei caratteri strutturali della Chiesa; è quindi stato necessario impostare una campagna di rilievi e indagini strutturali per definire le caratteristiche meccaniche dei materiali per impostare un modello ad elementi finiti in grado di valutare con migliore approssimazione gli effetti dello scavo di stazione sulla struttura. Le tempistiche dello scavo della stazione hanno consentito di attuare un confronto continuo tra le previsione numeriche e i dati di monitoraggio per ogni fase di scavo, permettendo di tarare il modello numerico e renderlo ancora più aderente al fenomeno fisico. La stazione è attualmente completata e gli spostamenti finali misurati sulla chiesa sono risultati allineati alle previsioni del modello. Nella nota si descrive l’intero processo di analisi seguito.
Building Risk Assessment; Marmorkirken Church (Cityringen Metro)
File in questo prodotto:
File Dimensione Formato  
MMKsubmitted.pdf

Solo gestori archivio

Descrizione: articolo
Tipologia: versione pre-print
Dimensione 2.32 MB
Formato Adobe PDF
2.32 MB Adobe PDF   Visualizza/Apri   Richiedi una copia
MMK_Gallerie2017_1.pdf

Solo gestori archivio

Descrizione: Articolo
Tipologia: versione editoriale
Dimensione 1.38 MB
Formato Adobe PDF
1.38 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11584/225000
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact