The survey phase is an essential prerequisite for effective management and improvement of existing buildings. The low accessibility of information regarding the design and construction phases and the current state of the buildings, are the main causes of inefficient actions on existing buildings. The lack of “As Built” documentation (building components, installations, etc.) and the complex task of detecting their current status in terms of use (intended use and space dimensions, environmental context, etc.) and maintenance (conservation status of building components, age of the technological installations, previous maintenance work, compliance with current regulations, etc.) causes deep difficulties in planning, scheduling and controlling appropriate interventions. Starting from these assumptions, this paper shows the findings of a research, aimed at testing the integrated use of Building Information Modeling (BIM) and 3D Geographic Information Systems (3D GIS) in order to structure knowledge. The research concerns a case study and it has actually led to the development of a BIM-3D GIS workflow which formalizes knowledge and information involved of a significant building, according to its management: the INA houses by Enrico Mandolesi, a residential complex for about 2500 inhabitants built around 1960 in the Eastern suburbs of Cagliari (Italy).

Integrating bim and gis data to support the management of large building stocks

Vacca, Giuseppina;Quaquero, Emanuela
;
Pili, Davide;Brandolini, Mauro
2018-01-01

Abstract

The survey phase is an essential prerequisite for effective management and improvement of existing buildings. The low accessibility of information regarding the design and construction phases and the current state of the buildings, are the main causes of inefficient actions on existing buildings. The lack of “As Built” documentation (building components, installations, etc.) and the complex task of detecting their current status in terms of use (intended use and space dimensions, environmental context, etc.) and maintenance (conservation status of building components, age of the technological installations, previous maintenance work, compliance with current regulations, etc.) causes deep difficulties in planning, scheduling and controlling appropriate interventions. Starting from these assumptions, this paper shows the findings of a research, aimed at testing the integrated use of Building Information Modeling (BIM) and 3D Geographic Information Systems (3D GIS) in order to structure knowledge. The research concerns a case study and it has actually led to the development of a BIM-3D GIS workflow which formalizes knowledge and information involved of a significant building, according to its management: the INA houses by Enrico Mandolesi, a residential complex for about 2500 inhabitants built around 1960 in the Eastern suburbs of Cagliari (Italy).
2018
BIM; Building stock; GIS; Knowledge process; Management strategies; Information Systems; Geography, Planning and Development
File in questo prodotto:
File Dimensione Formato  
isprs-archives-XLII-4-647-2018.pdf

accesso aperto

Descrizione: Articolo principale
Tipologia: versione editoriale (VoR)
Dimensione 1.07 MB
Formato Adobe PDF
1.07 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11584/256044
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 12
  • ???jsp.display-item.citation.isi??? ND
social impact