Several early-stage field failures in systems mounting GaAs MMICs were specifically related to MIM capacitor failures. Failure analysis, in turn, classified the failed cases into three main categories, all referred to some weakness in the technological process. The relevant point is that such weak devices can reach the field at such a large scale, despite the very well known nature of their weakness. Ineffective screening at the Manufacturer's plant is indicted for the problem. Lifetime prediction is attempted, on the user side, based on the detectability of the weak population

MIM Capacitor_related early-stage field failures

MURA, GIOVANNA
2012-01-01

Abstract

Several early-stage field failures in systems mounting GaAs MMICs were specifically related to MIM capacitor failures. Failure analysis, in turn, classified the failed cases into three main categories, all referred to some weakness in the technological process. The relevant point is that such weak devices can reach the field at such a large scale, despite the very well known nature of their weakness. Ineffective screening at the Manufacturer's plant is indicted for the problem. Lifetime prediction is attempted, on the user side, based on the detectability of the weak population
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11584/86256
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 8
  • ???jsp.display-item.citation.isi??? 5
social impact